Meuselwitz Solar Park – PV system grid connection

  • Cable route
  • Route length: 3,617 meters
  • Installed systems: up to 630 mm² and fiber optic
  • Construction period: 11/2025 – 02/2026

Lausen/Knautkleeberg – Knauthain Wind Farm – connection of 5 wind turbines

  • Cable route
  • Route length: 10,506 meters
  • Installed systems: up to 800 mm² and fiber optic
  • Construction period: 06/2025 – 11/2025

Mügeln Ablass Wind Farm – connection of 7 wind turbines

  • Underground cable construction
  • Route length: 16,513 meters
  • Installed systems: up to 500 mm² and fiber optic
  • Construction period: 12/2025 – 05/2026

Langendorf II Wind Farm – connection of 5 wind turbines

  • Connection
  • Route length: 7,009 meters
  • Installed systems: up to 800 mm² and fiber optic
  • Construction period: 09/2025 – 12/2025

Audenhain Solar Park – PV system grid connection

  • Cable route
  • Route length: 9,201 meters
  • Installed systems: up to 500 mm² and fiber optic
  • Construction period: 03/2025 – 11/2025

Kleinschirma Wind Farm – connection of 2 wind turbines

  • Cable route
  • Route length: 3,608 meters
  • Installed systems: up to 400 mm² and fiber optic
  • Construction period: 10/2024 – 04/2025

Delitzsch Solar Park – PV system grid connection

  • Cable route
  • Route length: 7,802 meters
  • Installed systems: up to 630 mm² and fiber optic
  • Construction period: 03/2024 – 10/2024